Specialized Medium Voltage power solutions engineered for the extreme requirements of heavy-duty mining operations in high-altitude environments. Our design focuses on low-temperature resilience, anti-attenuation insulation for low atmospheric pressure, and superior adaptation to high-impact loads.
Core Value Propositions
Adaptation to Heavy Impulse Loads
Mining equipment such as crushers and hoists generate intense, intermittent impulse loads. Our transformers utilize reinforced anti-impulse winding designs to prevent coil deformation, ensuring grid stability and avoiding frequent circuit trips or equipment failure.Extreme High-Altitude & Low-Temp Resilience
Specifically designed for low-pressure environments above 3,000 meters. We utilize reinforced insulation materials and specialized low-temperature dielectric fluids to maintain insulation strength and ensure stable cold-starts in environments reaching -25°C.OPEX Reduction & Efficiency Optimization
Mining operations are energy-intensive. Our transformers feature ultra-low loss designs (No-load loss ≤ 0.8% / Load loss ≤ 1.2%), directly assisting mining companies in controlling integrated operational costs and improving energy efficiency.
Specialized Product Portfolio
We provide hardware tailored for high-altitude mining sites, from standalone transformers to highly integrated substations:
S22 Fast Charge Series (Tier 1 Oil-Immersed Isolation)● Specs: Up to 2000kVA, 750V MV output tailored for DC fast charging modules.
● Features: Wide load handling, extreme dust and EMI resistance.
● Ideal For: Large public fast-charging hubs such as highway rest areas and commercial mall parking lots.
SCB14 Series (Cast Resin Dry-Type Isolation)● Specs: Class-H insulation, ultra-low noise (≤55dB), non-flammable.
● Features: Absolute fire safety, zero oil maintenance, and highly moisture-resistant.
● Ideal For: Indoor environments like high-rise basements and underground commercial parking where fire safety is paramount.
ZGS Series (Pad-Mounted Pre-installed Substation)● Specs: Fully enclosed, compliant with national EV infrastructure safety standards.
● Features: Pre-assembled at the factory for rapid deployment—on-site installation takes only 3 hours.
● Ideal For: Dispersed suburban stations, roadside rapid-charge points, and space-constrained areas.
YB/EL Series (Box-type Substation)● Specs: Multi-Voltage / Impedance Matching.
● Features: IP54 Outdoor Protection, Customizable Enclosure Design.
● Ideal For: Optimized for Rapid Deployment in Smelting Facilities.
Engineered for Extreme Mining Performance
We integrate specialized technical features to extend service life under low pressure and high-impact conditions:
● Multi-layer interference shielding between HV and LV windings suppresses harmonic disturbances generated by mining VFDs and heavy machinery, preventing abnormal coupling with grounded parts.
● Utilizing reinforced copper bars and a specialized layered fastening process, our windings can withstand current impulses up to 3 times the rated value, perfectly matching the "high power, intermittent operation" cycles of mining equipment.
● Advanced low-pressure resistant insulation materials paired with Vacuum Pressure Impregnation (VPI) eliminate partial discharge and insulation breakdown in thin-air environments up to 3000m.
Technical Specifications
Voltage Ratings
LV Input: 0.4 / 0.69 kV (Matches heavy mining motors)
MV Rated Voltage: 10 / 35 kV
Tapping Range: ±2 × 2.5% (Flexible grid compensation)
Core Performance
Short-Circuit Impedance: 6.0% - 8.0% (Optimized for 10kV high-impact loads)
Energy Efficiency: No-load loss ≤ 0.8% / Load loss ≤ 1.2%
Impulse Withstand: Handles 3x rated current shocks
Design Lifespan: 20 Years full lifecycle high-altitude adaptation
Environmental Tolerance
Operating Temp: -25℃ to +55℃
Maximum Altitude: Up to 3000 meters
Protection Rating: IP65 / C5-M (Resistant to dust, debris, and low-temp corrosion)
FAQ: Deployment & Operation
Q: How much construction time can the "Rapid Deployment" feature save for temporary mining power?
A: Our prefabricated mining substations reduce the construction cycle by approximately 60%. Traditional on-site assembly at high altitudes (including logistics, welding, and wiring) typically requires 15–20 days. Our integrated units are factory-tested and ready for use; once on-site, they only require foundation fixing and cable connection, allowing deployment to be completed within 2 to 3 days.
Q: Can the YB-MT series accommodate specific switchgear brands used in my current mine?
A: Yes. We offer fully customizable configurations. You can specify switchgear brands to ensure the unit seamlessly matches your existing power distribution system and maintenance protocols.